Table T3. Projected timeline of operations. (See table notes.)

Location
Transit distance
(nmi)
Transit time
(days)
Water
depth
(mbsl)
Sediment
depth
(mbsf)
Total coring depth
(mbsf)
Coring time
(days)
Logging time
(days)
Expedition duration
(days)
Primary sites                
Papeete, Tahiti (4 days)                
SPG-1A 978
3.9
5697
71
171
8.1
1.1
 
SPG-2A 494
2.0
5127
17
17
1.9
 
 
SPG-4A 1019
4.0
4284
20
120
5.5
1.0
 
SPG-6A 793
3.1
3738
15–23
123
4.5
1.0
SPG-10A 1073
4.3
5283
21
21
1.9
 
 
SPG-11B 625
2.5
5092
94–100
100
3.5
 
 
SPG-12A 499
2.0
5309
122–130
130
4.2
1.3
 
Auckland, NZ 1127
5.2
 
 
 
 
 
 
Totals:
6608
27.0
 
 
 
29.6
4.4
65.0
Secondary sites    
 
 
 
 
 
 
SPG-3A    
4852
6
106
5.1
 
 
SPG-5A    
4221
22
22
1.8
 
 
SPG-7A    
3688
<3
103
4.5
 
 
SPG-9A    
4925
20
20
2.0
 
 

Notes: Transit time is at 10.5 kt. Coring depths and times for proposed Sites SPG-1A, SPG-4A, and SPG-6A assume 100 m of basement penetration. Coring time estimates assume four advanced piston corer (APC) holes for the first three primary sites. The remaining four sites are scheduled for four APC holes, but an extra hole will be piston cored if time becomes available in the schedule. Any additional time will be used to deepen the basement holes. Coring time estimates also include one complete pipe trip per site (down and back) for the APC/sediment only sites and, at basement sites, two complete pipe trips per site (down and back), one for the APC holes and one for the rotary core barrel (RCB) hole. Logging time estimates assume two complete logging runs per site at ~12 h/trip for sites selected for logging. Proposed Sites SPG-3A and SPG-7A are alternate sites for basement objectives. Proposed Sites SPG-5A and SPG-9A are alternate sites for sediment objectives. Proposed Site SPG-8 is not included in the drilling plan because it was not surveyed during Cruise Knox-02RR.