IODP publications Expeditions Apply to sail Sample requests Site survey data Search | ||
|
doi:10.2204/iodp.sp.331.2010 Schedule for Expedition 331Expedition 331 is based on Integrated Ocean Drilling Program (IODP) drilling proposal number 601 (available at www.iodp.org/600/). Following ranking by the IODP Scientific Advisory Structure, the expedition was scheduled for the research vessel D/V Chikyu, operating under contract with the Center for Deep Earth Exploration. The expedition is currently scheduled to depart Shingu, Japan, on 1 September 2010 and to end in Nagoya, Japan, on 3 October 2010 (Table T1). A total of 22 days will be available for the drilling, coring, and downhole measurements described in this report (for the current detailed schedule, see www.jamstec.go.jp/chikyu/). Further details on the Chikyu can be found at www.jamstec.go.jp/chikyu/. |