Previous   |   Close   |   Next

Table T2. Alternate operations plan with logging-while-drilling (LWD) option, Expedition 334. (See table notes.)

Notes: Alternate site for CRIS-3B is CRIS-10A and alternate site for CRIS-4A is CRIS-11A. Shallow water guidelines to be used for both primary sites.

Previous   |   Close   |   Next   |   Top of page