Previous   |   Close  

Table T2. Planned operations and schedule, Expedition 337. (See table notes.)

Notes: CSG = casing. ROV = remotely operated vehicle. BOP = blowout preventer. DOC = drill out cement. TD = total depth. POOH = pull out of hole. RCB = rotary core barrel, BHA = bottom-hole assembly. VSP = vertical seismic profile. LOT = leak-off test. HPCS = hydraulic piston coring system, APCT-3 = advanced piston corer temperature tool.

Previous   |   Close    |   Top of page