Previous   |    Close   |    Next

Table T2. Summary of multichannel seismic lines used to locate proposed drill sites, Expedition 349.

Sites MCS Acquisition
date
Channels Processing Stacking/Interval
velocity
SCS-2C*    973SCSIO_1c 2001 48 Time migration  
ZSHL295 2008 480 Time migration  
SCS-2D*    ZSH275 2008 480 Time migration  
ZSHL295 2008 480 Time migration  
SCS-6A    08ec1573 2008 480 Time migration Yes
08ec2678 2008 480 Time migration Yes
SCS-6B*    08ec1602 2008 480 Time migration Yes
08ec2696 2008 480 Time migration Yes
SCS-6C* 973SCSIO01e 2001 48 Time migration  
SCS-3E*  BGR08-124 2008 312 Time migration  
SO49-017a 1987 48 Time migration  
SCS-3F  BGR08-124 2008 312 Time migration  
BGR08-123 2008 312 Time migration  
SCS-3G    973SCSIO01e 2001 48 Time migration  
SO49-017a 1987 48 Time migration  
SCS-3H*    BGR08-123 2008 312 Time migration  
SO49-018_1 1987 48 Time migration  
SCS-3I*  BGR08-123 2008 312 Time migration  
973SCSIO01e 2001 48 Time migration  
SCS-4B    973SCSIO_2b 2001 48 Time migration  
SIOSOA_NDS3     Time migration  
SCS-4C    973SCSIO_2b 2001 48 Time migration  
A3B6 2008 240 Time migration  
SCS-4D*  SIOSOA_NDS3     Time migration  
A3B6 2008 240 Time migration  
SCS-4E* SIOSOA_NDS3     Time migration  
SCS-4F* SIOSOA_NDS3     Time migration  
SCS-1C*    973GMGS_2 2001 240 Time migration  
ACT105 1996 6 Time migration  

* = Alternate site. † = Primary site for backup operations plan. Site SCS-6A is a primary site for both the operations plan and the backup operations plan.

Previous   |    Close   |    Next   |    Top of page