Table T24. T2P Deployment 25, Hole U1322D.
| Event | Time (GMT) |
Description |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 2:06:25 | Start lowering T2P downhole, pumps on |
| 3 | 2:14:56 | Stop at 491 mbsl, pumps off |
| 4 | 2:21:58 | Stop at 741 mbsl, pumps off |
| 5 | 2:32:58 | Stop at 1321 mbsl, pumps off |
| 6 | 2:38:36 | Stop at 1349 mbsl, pumps off |
| 7 | 2:40:40 | Start lowering probe |
| 8 | 2:45:08 | CDS lands in BHA; pumps off |
| 9 | 2:46:36 | Start penetration of T2P into sediment |
| 10 | 2:46:51 | End of T2P penetration; bit 0.8 m off bottom of hole |
| 11 | 2:46:56 | Raising BHA 4.0 m off bottom of hole |
| 12 | 3:49:19 | Pulling T2P uphole slowly with wireline |
| 13 | 3:52:54 | Stop at 1321 mbsl, pumps off |
| 14 | 3:55:26 | Pulling T2P uphole slowly with wireline |
| 15 | 4:02:38 | Stop at 741 mbsl, pumps off |
| 16 | 4:04:48 | Pulling T2P uphole slowly with wireline |
| 17 | 4:08:33 | Stop at 491 mbsl, pumps off |
| 18 | 4:10:41 | Pulling T2P uphole slowly with wireline |
| 19 | Data downloaded from data logger |
Notes: Depth = 40.0 mbsf. Date = 01 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly