Table T25. T2P Deployment 26, Hole U1322D.
| Event | Time (GMT) |
Event |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 6:32:00 | T2P on rig floor |
| 3 | 6:56:53 | Stop at 741 mbsl, pumps off |
| 4 | 7:07:51 | Stop at 1321 mbsl, pumps off |
| 5 | 7:18:15 | Stop at 1386 mbsl, pumps off |
| 6 | 7:20:27 | Start lowering probe |
| 7 | 7:24:50 | CDS lands in BHA; pumps off |
| 8 | 7:26:47 | Start penetration of T2P into sediment |
| 9 | 7:27:48 | End of T2P penetration; bit 0.8 m off bottom of hole |
| 10 | 7:27:54 | Raising BHA 4.0 m off bottom of hole |
| 11 | 8:14:30 | Pulling T2P uphole slowly with wireline |
| 12 | 8:16:29 | Stop at 1321 mbsl, pumps off |
| 13 | 8:26:26 | Stop at 741 mbsl, pumps off |
| 14 | 8:32:09 | Stop at 491 mbsl, pumps off |
| 15 | Data downloaded from data logger |
Notes: Depth = 70.0 mbsf. Date = 02 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.