Table T26. T2P Deployment 27, Hole U1322D.
| Event | Time (GMT) |
Description |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 11:04:50 | Stop at 491 mbsl, pumps off |
| 3 | 11:15:50 | Stop at 741 mbsl, pumps off |
| 4 | 11:15:56 | Stop at 1321 mbsl, pumps off |
| 5 | 11:24:06 | Stop at 1409 mbsl, pumps off |
| 6 | 11:26:27 | Start lowering probe |
| 7 | 11:29:25 | CDS lands in BHA; pumps off |
| 8 | 11:29:26 | Start penetration of T2P into sediment |
| 9 | 11:30:20 | End of T2P penetration; bit 0.8 m off bottom of hole |
| 10 | 11:30:25 | Raising BHA 4.0 m off bottom of hole |
| 11 | 12:16:01 | Pulling T2P uphole slowly with wireline |
| 12 | 12:19:11 | Stop at 1321 mbsl, pumps off |
| 13 | 12:28:55 | Stop at 741 mbsl, pumps off |
| 14 | 12:35:10 | Stop at 491 mbsl, pumps off |
| 15 | Data downloaded from data logger |
Notes: Depth = 100.0 mbsf. Date = 02 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.