Table T19. Event summary of T2P Deployment 7, Hole U1324B.
| Event | Time (CDT) |
Event |
|---|---|---|
| 1 | 15:18:00 | Data logger started at 1 Hz |
| 2 | 15:56:13 | T2P on rig floor |
| 3 | 16:07:34 | Start lowering T2P downhole, pumps on |
| 4 | 16:15:37 | Stop at 511 mbsl, pumps off |
| 5 | 16:17:21 | Start lowering probe, pumps on |
| 6 | 16:20:55 | Stop at 761 mbsl, pumps off |
| 7 | 16:22:48 | Start lowering probe, pumps on |
| 8 | 16:26:40 | Stop at 1058 mbsl, pumps off |
| 9 | 16:30:00 | Start lowering probe |
| 10 | 16:33:23 | Stop at 1164 mbsl, pumps off |
| 11 | 16:40:04 | Start lowering probe to land in BHA |
| 12 | 16:44:27 | CDS lands in BHA; pumps off |
| 13 | 16:47:23 | Start penetration of T2P into sediment |
| 14 | 16:48:41 | End of T2P penetration; bit 1 m off bottom of hole |
| 15 | 16:52:24 | Raising BHA 2 m off bottom of hole |
| 16 | 16:58:15 | Pumping at 14 spm |
| 17 | 17:28:50 | Pulling T2P uphole slowly with wireline |
| 18 | 17:33:15 | CDS clear of BHA |
| 19 | 17:34:00 | Stop at 1058 mbsl, pumps off |
| 20 | 17:36:23 | Pulling T2P uphole slowly with wireline |
| 21 | 17:40:42 | Stop at 760 mbsl, pumps off |
| 22 | 17:42:49 | Pulling T2P uphole slowly with wireline |
| 23 | 17:46:02 | Stop at 511 mbsl, pumps off |
| 24 | 17:48:12 | Pulling T2P uphole slowly with wireline |
| 25 | 17:55:35 | Wireline disconnected from CDS |
| 26 | 17:56:39 | CDS retracted |
| 27 | 17:58:10 | CDS disconnected from spacer |
| 28 | 17:59:55 | Spacer disconnected from CDS |
| 29 | 18:01:00 | T2P out of pipe |
| 30 | 18:08:18 | Data downloaded from data logger |
Notes: Depth = 117.8 mbsf. Date = 21 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. STM = strokes per minute.