Table T20. Event summary of T2P Deployment 8, Hole U1324B.
| Event | Time (CDT) |
Event |
|---|---|---|
| 1 | 19:28:15 | Data logger started at 1 Hz |
| 2 | 20:45:41 | T2P on rig floor |
| 3 | 20:58:19 | Start lowering T2P downhole, pumps on |
| 4 | 21:08:05 | Stop at 511 mbsl, pumps off |
| 5 | 21:10:10 | Start lowering probe, pumps on |
| 6 | 21:14:29 | Stop at 761 mbsl, pumps off |
| 7 | 21:17:00 | Start lowering probe, pumps on |
| 8 | 21:21:21 | Stop at 1058 mbsl, pumps off |
| 9 | 21:23:35 | Start lowering probe |
| 10 | 21:27:07 | Stop at 1151 mbsl, pumps off |
| 11 | 21:32:50 | Start lowering probe |
| 12 | 21:34:35 | Stop at 1181 mbsl, pumps off |
| 13 | 21:38:25 | Start lowering probe |
| 14 | 21:43:12 | CDS lands in BHA; pumps off |
| 15 | 21:43:58 | Start penetration of T2P into sediment |
| 16 | 21:44:49 | End of T2P penetration; bit at bottom of hole |
| 17 | 21:45:21 | Raising BHA 1.5 m off bottom of hole |
| 18 | 22:16:41 | Pulling T2P uphole slowly with wireline |
| 19 | 22:18:30 | CDS clear of BHA |
| 20 | 22:20:50 | Stop at 1058 mbsl, pumps off |
| 21 | 22:23:50 | Pulling T2P uphole slowly with wireline |
| 22 | 22:27:26 | Stop at 761 mbsl, pumps off |
| 23 | 22:30:25 | Pulling T2P uphole slowly with wireline |
| 24 | 22:33:40 | Stop at 511 mbsl, pumps off |
| 25 | 22:36:00 | Pulling T2P uphole slowly with wireline |
| 26 | 22:42:35 | Wireline disconnected from CDS |
| 27 | 22:45:08 | CDS disconnected from spacer |
| 28 | 22:46:30 | Spacer disconnected from CDS |
| 29 | 22:47:15 | T2P out of pipe |
| 30 | 23:11:00 | Data downloaded from data logger |
Notes: Depth = 136.3 mbsf. Date = 21 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time.
Previous | Close | Next | Top of page