Table AT36. Event summary of T2P Deployment 15, Hole U1324C, 200.0 mbsf. (See table notes.)
| Event number |
Time (GMT) |
Event description |
|---|---|---|
| 1 | 0049 | Start data logger at 1 Hz |
| 2 | 0156 | T2P on rig floor |
| 3 | 0209 | Start lowering T2P downhole, pumps on |
| 4 | 0217 | Stop at 491 mbsl, pumps off |
| 5 | 0219 | Start lowering probe |
| 6 | 0224 | Stop at 741 mbsl, pumps off |
| 7 | 0226 | Start lowering probe |
| 8 | 0232 | Stop at 1057 mbsl, pumps off |
| 9 | 0235 | Start lowering probe |
| 10 | 0240 | Stop at 1245 mbsl, pumps off |
| 11 | 0243 | Start lowering probe |
| 12 | 0247 | CDS lands in BHA, pumps off |
| 13 | 0248 | Start penetration of T2P into sediment |
| 14 | 0249 | End of T2P penetration, bit 1 m off BOH |
| 15 | 0252 | Raise BHA 4.5 m off BOH |
| 16 | 0353 | Pull T2P uphole slowly with wireline |
| 17 | 0356 | Stop at 1057 mbsl, pumps off |
| 18 | 0359 | Pull T2P uphole slowly with wireline |
| 19 | 0402 | Stop at 741 mbsl, pumps off |
| 20 | 0405 | Pull T2P uphole slowly with wireline |
| 21 | 0407 | Stop at 491 mbsl, pumps off |
| 22 | 0410 | Pull T2P uphole slowly with wireline |
| 23 | 0415 | Disconnect wireline from CDS |
| 24 | 0417 | Disconnect CDS from spacer |
| 25 | 0419 | Disconnect spacer from CDS |
| 26 | 0421 | T2P out of pipe |
| 27 | Download data from data logger |
Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page