Table AT43. Event summary of T2P Deployment 25, Hole U1322D, 40.0 mbsf. (See table notes.)
| Event number |
Time (GMT) |
Event description |
|---|---|---|
| 1 | Start data logger at 1 Hz | |
| 2 | 0206 | Start lowering T2P downhole, pumps on |
| 3 | 0214 | Stop at 491 mbsl, pumps off |
| 4 | 0221 | Stop at 741 mbsl, pumps off |
| 5 | 0232 | Stop at 1321 mbsl, pumps off |
| 6 | 0238 | Stop at 1349 mbsl, pumps off |
| 7 | 0240 | Start lowering probe |
| 8 | 0245 | CDS lands in BHA, pumps off |
| 9 | 0246 | Start penetration of T2P into sediment |
| 10 | 0246 | End of T2P penetration, bit 0.8 m off BOH |
| 11 | 0246 | Raise BHA 4.0 m off BOH |
| 12 | 0349 | Pull T2P uphole slowly with wireline |
| 13 | 0352 | Stop at 1321 mbsl, pumps off |
| 14 | 0355 | Pull T2P uphole slowly with wireline |
| 15 | 0402 | Stop at 741 mbsl, pumps off |
| 16 | 0404 | Pull T2P uphole slowly with wireline |
| 17 | 0408 | Stop at 491 mbsl, pumps off |
| 18 | 0410 | Pull T2P uphole slowly with wireline |
| 19 | Download data from data logger |
Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page