Table T1. Coring summary, Site U1355. (See table notes.)
| Site U1355 |
| Time on site (h): 67.25 (1045 h, 19 January–0600 h, 22 January 2010) |
| Hole U1355A |
| Latitude: 63°50.4704’S |
| Longitude: 138°49.4270’E |
| Time on hole (h): 67.25 (1045 h, 19 January–0600 h, 22 January 2010) |
| Seafloor (drill pipe measurement from rig floor, m DRF): 3740.0 |
| Distance between rig floor and sea level (m): 11.0 |
| Water depth (drill pipe measurement from sea level, m): 3729.0 |
| Total penetration (m DSF): 31.7 |
| Total depth (drill pipe measurement from rig floor, m DRF): 3771.7 |
| Total length of cored section (m): 31.7 |
| Total core recovered (m): 14.95 |
| Core recovery (%): 47 |
| Total number of cores: 4 |
| Core |
Date (2010) |
Local time (h) |
Depth DSF-A (m) |
Interval advanced (m) |
Depth CSF-A (m) |
Length of core recovered (m) |
Recovery (%) |
||
|---|---|---|---|---|---|---|---|---|---|
|
Top of cored interval |
Bottom of cored interval |
Top of cored interval |
Bottom of cored interval |
||||||
| 318-U1355A- | |||||||||
| 1R | 21 Jan | 1105 | 0.0 | 3.5 | 3.5 | 0.00 | 5.30 | 5.30 | 151 |
| 2R | 21 Jan | 1400 | 3.5 | 13.1 | 9.6 | 3.50 | 10.88 | 7.38 | 77 |
| 3R | 21 Jan | 1650 | 13.1 | 22.7 | 9.6 | 13.10 | 13.15 | 0.05 | 1 |
| 4R | 21 Jan | 2055 | 22.7 | 31.7 | 9.0 | 22.70 | 24.92 | 2.22 | 25 |
| Cored totals: | 31.7 | 14.95 | 47 | ||||||
| Total interval cored: | 31.7 | ||||||||
Notes: DRF = drilling depth below rig floor. DSF-A = drilling depth below seafloor, determined by tagging seafloor, CSF-A = core depth below seafloor, overlap if long. Local time = UTC + 11 h.
Close | Next | Top of page