Table T1. Coring summary, Site U1335. (See table notes.)
| Site U1335 |
| Time on site (h): 149.3 (1630 h, 15 April–2145 h, 21 April 2009) |
| Hole U1335A |
| Latitude: 5°18.734′N |
| Longitude: 126°16.995′W |
| Time on hole (h):72.9 (1630 h, 15 April–1725 h, 18 April 2009) |
| Seafloor (drill pipe measurement below rig floor, m DRF): 4339.0 |
| Distance between rig floor and sea level (m): 11.5 |
| Water depth (drill pipe measurement from sea level, mbsl): 4327.5 |
| Total depth (drill pipe measurement from rig floor, m DRF): 4760.1 |
| Total penetration (drilling depth below seafloor, m DSF): 421.1 |
| Total length of cored section (m): 421.1 |
| Total core recovered (m): 422.1 |
| Core recovery (%): 101 |
| Total number of cores: 45 |
| Hole U1335B |
| Latitude: 5°18.736′N |
| Longitude: 126°17.009′W |
| Time on hole (h): 76.3 (1725 h, 18 April–2145 h, 21 April 2009) |
| Seafloor (drill pipe measurement below rig floor, m DRF): 4339.6 |
| Distance between rig floor and sea level: 11.5 m |
| Water depth (drill pipe measurement from sea level, mbsl): 4328.1 |
| Total depth (drill pipe measurement from rig floor, m DRF): 4757.1 |
| Total penetration (drilling depth below seafloor, m DSF): 417.5 |
| Total length of cored section (m): 417.5 |
| Total core recovered (m): 428.7 |
| Core recovery (%): 103 |
| Total number of cores: 46 |
Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. H = APC core, X = XCB core. Local time = UTC – 10 h.