Table T1. Coring summary, Site U1336. (See table notes.)
| Site U1336 |
| Time on site (h): 93.5 (1545 h, 22 April–1315 h, 26 April 2009) |
| Hole U1336A |
| Latitude: 7°42.074′N |
| Longitude: 128°15.253′W |
| Time on hole (h): 60.3 (1545 h, 22 April–0400 h, 25 April 2009) |
| Seafloor (drill pipe measurement below rig floor, m DRF): 4296.9 |
| Distance between rig floor and sea level: 11.6 m |
| Water depth (drill pipe measurement from sea level, mbsl): 4285.3 |
| Total depth (drill pipe measurement from rig floor, m DRF): 4599.8 |
| Total penetration (drilling depth below seafloor, m DSF): 302.9 |
| Total length of cored section (m): 302.9 |
| Total core recovered (m): 259.1 |
| Core recovery (%): 86 |
| Total number of cores: 35 |
| Hole U1336B |
| Latitude: 7°42.060′N |
| Longitude: 128°15.253′W |
| Time on hole (h): 33.3 (0400 h, 25 April–1315 h, 26 April 2009) |
| Seafloor (drill pipe measurement below rig floor, m DRF): 4298.1 |
| Distance between rig floor and sea level: 11.6 m |
| Water depth (drill pipe measurement from sea level, mbsl): 4286.5 |
| Total depth (drill pipe measurement from rig floor, m DRF): 4472.0 |
| Total penetration (drilling depth below seafloor, m DSF): 173.9 |
| Total length of cored section (m): 173.9 |
| Total core recovered (m): 179.59 |
| Core recovery (%): 103 |
| Total number of cores: 20 |
Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. H = APC core, X = XCB core. Local time = UTC – 10 h.
Close | Next | Top of page