Priority:
|
Primary |
|
Position:
|
22°48.1149′N, 46°3.1753′W |
|
Water depth (m below sea level):
|
4395 |
|
Target drilling depth (m below seafloor):
|
175 |
|
Approved maximum penetration (mbsf):
|
Pending IODP Environmental Protection and Safety Panel review |
|
Survey coverage (track map; seismic profile):
|
SCS05, Shotpoint 3935
• Track map (Fig. AF1)
• Seismic line (Fig. AF5) |
|
Objective(s):
|
1. Core sediments (85 m) and uppermost basement (~90 m)
2. Install long term borehole observatory (CORK) |
|
Drilling program:
|
• APC/XCB to basement
• RCB core into basement
• Conduct wireline logging and drill string hydrologic (packer) experiments
• Install long-term borehole observatory (CORK) |
|
Logging program OR
downhole measurements program:
|
Full wireline logging program |
|
Nature of rock anticipated:
|
Foraminiferal ooze and sand, clay, basalt |