Table AT11. Event summary of DVTPP Deployment 10, Hole U1324B, 560.4 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0720 Start lowering DVTPP downhole
2 0731 Stop at mudline for 5 min
3 0736 Start lowering probe
4 0739 Raise BHA 16 m off BOH
5 0742 CDS lands in BHA
6 0742 Lower bit, start penetration of DVTPP into formation
7 0747 End of penetration, bit on BOH
8 0748 Raise BHA 4 m off BOH
9 0819 Pull probe out of formation and uphole with wireline
10 0827 Stop at mudline for 5 min
11 0832 Pull DVTPP uphole with wireline

Notes: Measurements taken 25 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.