Table AT12. Event summary of DVTPP Deployment 11, Hole U1324B, 589.2 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1402 Start lowering DVTPP downhole
2 1411 Stop at mudline for 5 min
3 1416 Start lowering probe
4 1416 Raise BHA 23 m off BOH
5 1423 CDS lands in BHA
6 1423 Lower bit, start penetration of DVTPP into formation
7 1430 End of penetration, bit on BOH
8
Raise BHA off BOH
9 1515 Pull probe out of formation and uphole with wireline
10 1522 Stop at mudline for 5 min
11 1527 Pull DVTPP uphole with wireline

Notes: Measurements taken 25 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.