Previous   |    Close   |    Next

Table AT13. Event summary of DVTPP Deployment 12, Hole U1324B, 608.2 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 2248 Start lowering DVTPP downhole
2 2305 Stop at mudline for 5 min
3 2310 Start lowering probe
4 2257 Raise BHA 17 m off BOH
5 2318 CDS lands in BHA
6 2329 Lower bit, start penetration of DVTPP into formation
7 2334 End of the first penetration, bit is 0.2 m off BOH
8 2334 Raise BHA 4 m off BOH
9 2335 Lower bit, start further penetration
10 2335 End of penetration, bit on BOH
11 2336 Raise BHA 3 m off BOH
12 0037 Pull probe out of formation and uphole with wireline
13 0045 Stop at mudline for 5 min
14 0050 Pull DVTPP uphole with wireline

Notes: Measurements taken 25 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.

Previous   |    Close   |    Next   |    Top of page