Table AT14. Event summary of DVTPP Deployment 13, Hole U1324C, 250 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0700 Start lowering DVTPP downhole
2 0709 Stop at mudline for 5 min
3 0714 Start lowering probe
4 0716 Raise BHA 14.5 m off BOH
5 0717 CDS lands in BHA
6 0717 Lower bit, start penetration of DVTPP into formation
7 0722 End of first penetration, bit 0.15 m off BOH
8 0724 Raise BHA 3.5 m off BOH
9 0724 Lower bit, start further penetration
10 0725 End of penetration, bit on BOH
11 0855 Pull probe out of formation and uphole with wireline
12 0900 Stop at mudline for 5 min
13 0904 Pull DVTPP uphole with wireline

Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.