Table AT15. Event summary of DVTPP Deployment 14, Hole U1324C, 405 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1752 Start lowering DVTPP downhole
2 1800 Stop at mudline for 5 min
3 1805 Start lowering probe
4 1756 Move BHA to 17 m off BOH
5 1812 CDS lands in BHA
6 1822 Lower bit, start penetration of DVTPP into formation
7 1826 End of penetration, bit on BOH
8 1830 Raise BHA 8.5 m off BOH
9 2000 Pull probe out of formation and uphole with wireline
10 2007 Stop at mudline for 5 min
11 2012 Pull DVTPP uphole with wireline

Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.