Table AT15. Event summary of DVTPP Deployment 14, Hole U1324C, 405 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1752 | Start lowering DVTPP downhole |
2 | 1800 | Stop at mudline for 5 min |
3 | 1805 | Start lowering probe |
4 | 1756 | Move BHA to 17 m off BOH |
5 | 1812 | CDS lands in BHA |
6 | 1822 | Lower bit, start penetration of DVTPP into formation |
7 | 1826 | End of penetration, bit on BOH |
8 | 1830 | Raise BHA 8.5 m off BOH |
9 | 2000 | Pull probe out of formation and uphole with wireline |
10 | 2007 | Stop at mudline for 5 min |
11 | 2012 | Pull DVTPP uphole with wireline |
Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.
Previous | Close | Next | Top of page