Table AT16. Event summary of DVTPP Deployment 15, Hole U1324C, 505 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0030 Start lowering DVTPP downhole
2 0043 Stop at mudline for 5 min
3 0048 Start lowering probe
4 0057 CDS lands in BHA
5 0106 Lower bit, start penetration of DVTPP into formation
6 0109 End of penetration, bit on BOH
7 0112 Raise BHA 6.4 m off BOH
8 0242 Pull probe out of formation and uphole with wireline
9 0249 Stop at mudline for 5 min
10 0254 Pull DVTPP uphole with wireline

Notes: Measurements taken 28 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.