Table AT18. Event summary of DVTPP Deployment 17, Hole U1322C, 100 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0152 Start lowering DVTPP downhole
2 0211 Stop at mudline for 5 min
3 0216 Start lowering probe
4
Move BHA off BOH
5 0222 CDS lands in BHA
6 0233 Lower bit, start penetration of DVTPP into formation
7 0234 End of penetration, bit on BOH
8 0235 Raise BHA 4 m off BOH
9 0405 Pull probe out of formation and uphole with wireline
10 0409 Stop at mudline for 5 min
11 0414 Pull DVTPP uphole with wireline

Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.