Previous   |    Close   |    Next

Table AT19. Event summary of DVTPP Deployment 18, Hole U1322C, 220 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1545 Start lowering DVTPP downhole
2 1607 Stop at mudline for 5 min
3 1612 Start lowering probe
4
Move BHA to 16 m off BOH
5 1616 CDS lands in BHA
6 1617 Lower bit, start penetration of DVTPP into formation
7 1619 End of penetration, bit on BOH
8 1619 Raise BHA 5 m off BOH
9 1721 Pull probe out of formation and uphole with wireline
10 1728 Stop at mudline for 5 min
11 1733 Pull DVTPP uphole with wireline

Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.