Table AT20. Event summary of DVTPP Deployment 19, Hole U1322C, 238 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1901 | Start lowering DVTPP downhole |
2 | 1923 | Stop at mudline for 5 min |
3 | 1928 | Start lowering probe |
4 | 1928 | Moving BHA to 11 m off BOH |
5 | 1934 | CDS lands in BHA |
6 | 1944 | Lower bit, start penetration of DVTPP into formation |
7 | 1945 | End of penetration, bit on BOH |
8 | 1946 | Raise BHA 2 m off BOH |
9 | 1948 | Lower BHA back to BOH |
10 | 1950 | Raise BHA 6 m off BOH |
11 | 2118 | Pull probe out of formation and uphole with wireline |
12 | 2124 | Stop at mudline for 5 min |
13 | 2128 | Pull DVTPP uphole with wireline |
Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.
Previous | Close | Next | Top of page