Table AT25. Event summary of T2P Deployment 3, Hole U1320A, 126.3 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 2308 T2P on rig floor
3 2314 Remove pressure response chamber from T2P tip
4 2314 Place shroud over T2P tip
5 2315 Connect T2P to spacer
6 2317 Connect CDS to spacer
7 2322 Connect CDS to wireline
8 2323 Start lowering T2P downhole, pumps on
9 2330 Stop at 511 mbsl, pumps off
10 2333 Start lowering probe, pumps on
11 2340 Stop at 1011 mbsl, pumps off
12 2343 Start lowering probe, pumps on
13 2344 Pump at 13 spm
14 2350 Stop at 1490 mbsl, pumps off
15 2353 Start lowering probe, pumps on at 13 spm
16 2357 Pumps off
17 0000 CDS lands in BHA
18 0000 Raise BHA to 2 m off BOH
19 0002 Start penetration of T2P into sediment, 2m advance of BHA
20 0003 End of T2P penetration
21 0004 Raise BHA 3m off BOH
22 0007 Pump at 10 spm
23 0055 Pull T2P uphole slowly 10 m
24 0059 10 m pull completed
25 0059 Pull T2P uphole, pump at 10 spm
26 0105 Stop at 511 mbsl, pumps off
27 0109 Pull T2P uphole, pumps on
28 0113 Detach CDS from wireline
29 0116 Detach CDS from spacer
30 0118 Detach spacer from T2P
31 0118 T2P on rig floor
32 0118 T2P tip in pressure response chamber
33 0126 T2P in workroom
34 0146 Remove battery from T2P
35 0146 Connect T2P to DC power


Download data from data logger