Table AT25. Event summary of T2P Deployment 3, Hole U1320A, 126.3 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 2308 | T2P on rig floor |
3 | 2314 | Remove pressure response chamber from T2P tip |
4 | 2314 | Place shroud over T2P tip |
5 | 2315 | Connect T2P to spacer |
6 | 2317 | Connect CDS to spacer |
7 | 2322 | Connect CDS to wireline |
8 | 2323 | Start lowering T2P downhole, pumps on |
9 | 2330 | Stop at 511 mbsl, pumps off |
10 | 2333 | Start lowering probe, pumps on |
11 | 2340 | Stop at 1011 mbsl, pumps off |
12 | 2343 | Start lowering probe, pumps on |
13 | 2344 | Pump at 13 spm |
14 | 2350 | Stop at 1490 mbsl, pumps off |
15 | 2353 | Start lowering probe, pumps on at 13 spm |
16 | 2357 | Pumps off |
17 | 0000 | CDS lands in BHA |
18 | 0000 | Raise BHA to 2 m off BOH |
19 | 0002 | Start penetration of T2P into sediment, 2m advance of BHA |
20 | 0003 | End of T2P penetration |
21 | 0004 | Raise BHA 3m off BOH |
22 | 0007 | Pump at 10 spm |
23 | 0055 | Pull T2P uphole slowly 10 m |
24 | 0059 | 10 m pull completed |
25 | 0059 | Pull T2P uphole, pump at 10 spm |
26 | 0105 | Stop at 511 mbsl, pumps off |
27 | 0109 | Pull T2P uphole, pumps on |
28 | 0113 | Detach CDS from wireline |
29 | 0116 | Detach CDS from spacer |
30 | 0118 | Detach spacer from T2P |
31 | 0118 | T2P on rig floor |
32 | 0118 | T2P tip in pressure response chamber |
33 | 0126 | T2P in workroom |
34 | 0146 | Remove battery from T2P |
35 | 0146 | Connect T2P to DC power |
Download data from data logger |