Table AT24. Event summary of T2P Deployment 2, Hole U1319A, 80.5 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 0607 | Start data logger at 1 Hz |
2 | 1313 | T2P on rig floor |
3 | 1315 | Raise T2P vertically |
4 | 1316 | Remove pressure response chamber from T2P tip |
5 | 1316 | Place shroud over T2P tip |
6 | 1319 | Place T2P in drill pipe |
7 | 1320 | Connect T2P to spacer |
8 | 1323 | Connect CDS to spacer |
9 | 1325 | CDS in extended position |
10 | 1326 | Start lowering T2P downhole, pumps on |
11 | 1335 | Stop at 511 mbsl, pumps off |
12 | 1337 | Start lowering probe, pumps on |
13 | 1344 | Stop at 1012 mbsl, pumps off |
14 | 1346 | Start lowering probe, pumps on |
15 | 1352 | Stop at 1431 mbsl, pumps off |
16 | 1355 | Start lowering probe |
17 | 1358 | Pass T2P through LFV |
18 | 1405 | CDS lands in BHA |
19 | 1408 | Start penetration of T2P into sediment |
20 | 1415 | End of T2P penetration |
21 | 1427 | Pumps on at 10 spm |
22 | 1447 | Start pulling T2P uphole |
23 | 1448 | Stop pulling at 1509 mbsl |
24 | 1449 | Pull/release winch to free CDS from BHA |
25 | 1452 | Start pulling T2P uphole |
26 | 1509 | Stop at 511 mbsl, pumps off |
27 | 1511 | Start pulling T2P uphole |
28 | 1520 | Detach CDS from wireline |
29 | 1527 | Detach CDS from spacer |
30 | 1530 | Detach spacer from T2P |
31 | 1530 | T2P on rig floor |
32 | 1531 | T2P tip in pressure response chamber |
33 | 1539 | T2P in workroom |
34 | 1549 | Remove battery from T2P |
35 | 1604 | Connect T2P to DC power |
36 | 1605 | Download data from data logger |
Notes: Measurements taken 7 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, LFV = lockable float valve, spm = strokes per minute, BHA = bottom-hole assembly, DC = direct current.