Table AT23. Event summary of T2P Deployment 1, Hole 1319A. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 2331 | Start data logger at 1 Hz |
2 | 0146 | T2P on rig floor |
3 | 0210 | Raise T2P vertically |
4 | 0210 | Remove pressure response chamber from T2P tip |
5 | 0210 | Place shroud over T2P tip |
6 | 0211 | Place T2P in drill pipe |
7 | 0213 | Connect T2P to spacer |
8 | 0216 | Connect CDS to spacer |
9 | 0216 | CDS in extended position |
10 | 0220 | Start lowering T2P downhole |
11 | 0232 | Stop at 511 mbsl |
12 | 0235 | Start lowering probe |
13 | 0241 | Stop at 1011 mbsl |
14 | 0244 | Start lowering probe |
15 | 0255 | Stop at 1388 mbsl |
16 | 0301 | Start pulling T2P uphole |
17 | 0316 | Stop at 1010 mbsl |
18 | 0319 | Continue pulling T2P uphole |
19 | 0323 | Stop at 511 mbsl |
20 | 0325 | Continue pulling T2P uphole |
21 | 0341 | T2P on rig floor |
22 | 0341 | T2P tip in pressure response chamber |
23 | 0346 | Pressure response test |
24 | 0358 | Download data from data logger |
25 | 0440 | Remove battery from T2P |
Notes: Tool test in water column, 7 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system.
Previous | Close | Next | Top of page