Previous   |    Close   |    Next

Table AT27. Event summary of T2P Deployment 5, Hole U1324B, 51.3 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1140 T2P on rig floor
3 1147 Remove pressure response chamber from T2P tip
4 1147 Place shroud over T2P tip
5 1148 Connect T2P to spacer
6 1150 Connect CDS to spacer
7 1155 Start lowering T2P downhole, pumps on
8 1204 Stop at 515 mbsl, pumps off
9 1208 Start lowering probe, pumps on
10 1212 Stop at 768 mbsl, pumps off
11 1214 Start lowering probe, pumps on
12 1219 Stop at 1066 mbsl, pumps off
13 1222 Start lowering probe, pumps on at 18 spm
14 1223 Bit is 0.5 m off BOH
15 1224 Start lowering probe to land in BHA
16 1225 CDS lands in BHA, pumps off
17 1225 Raise BHA to 2 m off BOH
18 1226 Start penetration of T2P into sediment, 2 m advance of BHA
19 1227 End of T2P penetration, bit 0.25 m off BOH
20 1227 Raise BHA 2 m off BOH
21 1232 Pump at 11 spm
22 1257 Pull T2P uphole slowly with wireline
23 1258 CDS clear of BHA
24 1300 Stop at 1067 mbsl, pumps off
25 1304 Pull T2P uphole slowly with wireline
26 1309 Stop at 767 mbsl, pumps off
27 1311 Pull T2P uphole slowly with wireline
28 1315 Stop at 516 mbsl, pumps off
29 1317 Pull T2P uphole slowly with wireline
30 1325 Disconnect wireline from CDS
31 1325 Extend CDS
32 1328 Disconnect CDS from spacer
33 1328 Disconnect spacer from CDS
34 1330 Disconnect T2P from spacer
35 1333 T2P out of pipe
36
Download data from data logger

Notes: Measurements taken 21 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, spm = strokes per minute, BOH = bottom of hole, BHA = bottom-hole assembly.

Previous   |    Close   |    Next   |    Top of page