Table AT28. Event summary of T2P Deployment 6, Hole U1324B, 89.3 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1417 | Start data logger at 1 Hz |
2 | 1615 | T2P on rig floor |
3 | 1647 | Start lowering T2P downhole, pumps on |
4 | 1656 | Stop at 511 mbsl, pumps off |
5 | 1657 | Start lowering probe, pumps on |
6 | 1703 | Stop at 761 mbsl, pumps off |
7 | 1704 | Start lowering probe, pumps on |
8 | 1710 | Stop at 1058 mbsl, pumps off |
9 | 1716 | Start lowering probe |
10 | 1718 | Stop at 1135 mbsl, pumps off |
11 | 1720 | Start lowering probe to land in BHA |
12 | 1722 | CDS lands in BHA, pumps off |
13 | 1731 | Start penetration of T2P into sediment |
14 | 1733 | End of T2P penetration, bit 1 m off BOH |
15 | 1736 | Raise BHA 2 m off BOH |
16 | 1742 | Pump at 11 spm |
17 | 1808 | Pull T2P uphole slowly with wireline |
18 | 1811 | CDS clear of BHA |
19 | 1813 | Stop at 1058 mbsl, pumps off |
20 | 1815 | Pull T2P uphole slowly with wireline |
21 | 1818 | Stop at 760 mbsl, pumps off |
22 | 1820 | Pull T2P uphole slowly with wireline |
23 | 1823 | Stop at 511 mbsl, pumps off |
24 | 1825 | Pull T2P uphole slowly with wireline |
25 | 1831 | Disconnect wireline from CDS |
26 | 1832 | Retract CDS |
27 | 1835 | Disconnect CDS from spacer |
28 | 1837 | Disconnect spacer from CDS |
29 | 1838 | T2P out of pipe |
30 | 1850 | Download data from data logger |
Notes: Measurements taken 21 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, BHA = bottom-hole assembly, CDS = colleted delivery system, BOH = bottom of hole, spm = strokes per minute.
Previous | Close | Next | Top of page