Table AT29. Event summary of T2P Deployment 7, Hole U1324B, 117.8 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 2018 Start data logger at 1 Hz
2 2056 T2P on rig floor
3 2107 Start lowering T2P downhole, pumps on
4 2115 Stop at 511 mbsl, pumps off
5 2117 Start lowering probe, pumps on
6 2120 Stop at 761 mbsl, pumps off
7 2122 Start lowering probe, pumps on
8 2126 Stop at 1058 mbsl, pumps off
9 2130 Start lowering probe
10 2133 Stop at 1164 mbsl, pumps off
11 2140 Start lowering probe to land in BHA
12 2144 CDS lands in BHA, pumps off
13 2147 Start penetration of T2P into sediment
14 2148 End of T2P penetration, bit 1 m off BOH
15 2152 Raise BHA 2 m off BOH
16 2158 Pump at 14 spm
17 2228 Pull T2P uphole slowly with wireline
18 2233 CDS clear of BHA
19 2234 Stop at 1058 mbsl, pumps off
20 2236 Pull T2P uphole slowly with wireline
21 2240 Stop at 760 mbsl, pumps off
22 2242 Pull T2P uphole slowly with wireline
23 2246 Stop at 511 mbsl, pumps off
24 2248 Pull T2P uphole slowly with wireline
25 2255 Disconnect wireline from CDS
26 2256 Retract CDS
27 2258 Disconnect CDS from spacer
28 2259 Disconnect spacer from CDS
29 2301 T2P out of pipe
30 2308 Download data from data logger

Notes: Measurements taken 21 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, BHA = bottom-hole assembly, CDS = colleted delivery system, BOH = bottom of hole, spm = strokes per minute.