Table AT29. Event summary of T2P Deployment 7, Hole U1324B, 117.8 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 2018 | Start data logger at 1 Hz |
2 | 2056 | T2P on rig floor |
3 | 2107 | Start lowering T2P downhole, pumps on |
4 | 2115 | Stop at 511 mbsl, pumps off |
5 | 2117 | Start lowering probe, pumps on |
6 | 2120 | Stop at 761 mbsl, pumps off |
7 | 2122 | Start lowering probe, pumps on |
8 | 2126 | Stop at 1058 mbsl, pumps off |
9 | 2130 | Start lowering probe |
10 | 2133 | Stop at 1164 mbsl, pumps off |
11 | 2140 | Start lowering probe to land in BHA |
12 | 2144 | CDS lands in BHA, pumps off |
13 | 2147 | Start penetration of T2P into sediment |
14 | 2148 | End of T2P penetration, bit 1 m off BOH |
15 | 2152 | Raise BHA 2 m off BOH |
16 | 2158 | Pump at 14 spm |
17 | 2228 | Pull T2P uphole slowly with wireline |
18 | 2233 | CDS clear of BHA |
19 | 2234 | Stop at 1058 mbsl, pumps off |
20 | 2236 | Pull T2P uphole slowly with wireline |
21 | 2240 | Stop at 760 mbsl, pumps off |
22 | 2242 | Pull T2P uphole slowly with wireline |
23 | 2246 | Stop at 511 mbsl, pumps off |
24 | 2248 | Pull T2P uphole slowly with wireline |
25 | 2255 | Disconnect wireline from CDS |
26 | 2256 | Retract CDS |
27 | 2258 | Disconnect CDS from spacer |
28 | 2259 | Disconnect spacer from CDS |
29 | 2301 | T2P out of pipe |
30 | 2308 | Download data from data logger |
Notes: Measurements taken 21 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, BHA = bottom-hole assembly, CDS = colleted delivery system, BOH = bottom of hole, spm = strokes per minute.