Table AT30. Event summary of T2P Deployment 8, Hole U1324B, 136.3 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 0028 | Start data logger at 1 Hz |
2 | 0145 | T2P on rig floor |
3 | 0158 | Start lowering T2P downhole, pumps on |
4 | 0208 | Stop at 511 mbsl, pumps off |
5 | 0210 | Start lowering probe, pumps on |
6 | 0214 | Stop at 761 mbsl, pumps off |
7 | 0217 | Start lowering probe, pumps on |
8 | 0221 | Stop at 1058 mbsl, pumps off |
9 | 0223 | Start lowering probe |
10 | 0227 | Stop at 1151 mbsl, pumps off |
11 | 0232 | Start lowering probe |
12 | 0234 | Stop at 1181 mbsl, pumps off |
13 | 0238 | Start lowering probe |
14 | 0243 | CDS lands in BHA, pumps off |
15 | 0243 | Start penetration of T2P into sediment |
16 | 0244 | End of T2P penetration, bit at BOH |
17 | 0245 | Raise BHA 1.5 m off BOH |
18 | 0316 | Pull T2P uphole slowly with wireline |
19 | 0318 | CDS clear of BHA |
20 | 0320 | Stop at 1058 mbsl, pumps off |
21 | 0323 | Pull T2P uphole slowly with wireline |
22 | 0327 | Stop at 761 mbsl, pumps off |
23 | 0330 | Pull T2P uphole slowly with wireline |
24 | 0333 | Stop at 511 mbsl, pumps off |
25 | 0336 | Pull T2P uphole slowly with wireline |
26 | 0342 | Disconnect wireline from CDS |
27 | 0345 | Disconnect CDS from spacer |
28 | 0346 | Disconnect spacer from CDS |
29 | 0347 | T2P out of pipe |
30 | 0411 | Download data from data logger |
Notes: Measurements taken 22 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page