Table AT31. Event summary of T2P Deployment 9, Hole U1324B, 368.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1328 | Start data logger at 1 Hz |
2 | 1457 | T2P on rig floor |
3 | 1511 | Start lowering T2P downhole, pumps on |
4 | 1528 | Stop at 1058 mbsl, pumps off |
5 | 1533 | Start lowering probe |
6 | 1545 | Stop at 1432 mbsl, pumps off |
7 | 1549 | Start lowering probe |
8 | 1553 | CDS lands in BHA, pumps off |
9 | 1554 | Start penetration of T2P into sediment |
10 | 1558 | End of T2P penetration, bit at BOH |
11 | 1559 | Raise BHA 2 m off BOH |
12 | 1640 | Pull T2P uphole slowly with wireline |
13 | 1648 | Stop at 1058 mbsl, pumps off |
14 | 1651 | Pull T2P uphole slowly with wireline |
15 | 1701 | Disconnect wireline from CDS |
16 | 1704 | Disconnect CDS from spacer |
17 | 1706 | Disconnect spacer from CDS |
18 | 1708 | T2P out of pipe |
19 | 1730 | Download data from data logger |
Notes: Measurements taken 23 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page