Table AT31. Event summary of T2P Deployment 9, Hole U1324B, 368.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1328 Start data logger at 1 Hz
2 1457 T2P on rig floor
3 1511 Start lowering T2P downhole, pumps on
4 1528 Stop at 1058 mbsl, pumps off
5 1533 Start lowering probe
6 1545 Stop at 1432 mbsl, pumps off
7 1549 Start lowering probe
8 1553 CDS lands in BHA, pumps off
9 1554 Start penetration of T2P into sediment
10 1558 End of T2P penetration, bit at BOH
11 1559 Raise BHA 2 m off BOH
12 1640 Pull T2P uphole slowly with wireline
13 1648 Stop at 1058 mbsl, pumps off
14 1651 Pull T2P uphole slowly with wireline
15 1701 Disconnect wireline from CDS
16 1704 Disconnect CDS from spacer
17 1706 Disconnect spacer from CDS
18 1708 T2P out of pipe
19 1730 Download data from data logger

Notes: Measurements taken 23 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.

Previous   |    Close   |    Next   |    Top of page