Table AT32. Event summary of T2P Deployment 11, Hole U1324B, 593.2 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1802 | Start data logger at 1 Hz |
2 | 1818 | T2P on rig floor |
3 | 1831 | Start lowering T2P downhole, pumps on |
4 | 1842 | Stop at 1068 mbsl, pumps off |
5 | 1845 | Start lowering probe |
6 | 1850 | Stop at 1510 mbsl, pumps off |
7 | 1856 | Start lowering probe |
8 | 1858 | CDS lands in BHA, pumps off |
9 | 1914 | Pull T2P uphole slowly with wireline |
10 | 1925 | Stop at 1067 mbsl, pumps off |
11 | 1928 | Pull T2P uphole slowly with wireline |
12 | 1934 | Disconnect wireline from CDS |
13 | 1938 | Disconnect CDS from spacer |
14 | 1940 | Disconnect spacer from CDS |
15 | 1946 | T2P out of pipe |
16 | 2010 | Download data from data logger |
Notes: Measurements taken 25 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly.