Previous   |    Close   |    Next

Table AT33. Event summary of T2P Deployment 12, Hole U1324C, 50.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1044 T2P on rig floor
3 1052 Start lowering T2P downhole, pumps on
4 1109 Stop at 491 mbsl, pumps off
5 1111 Start lowering probe
6 1114 Stop at 741 mbsl, pumps off
7 1119 Stop at 1057 mbsl, pumps off
8 1122 Stop at 1095 mbsl, pumps off
9 1128 Start lowering probe
10 1129 CDS lands in BHA, pumps off
11 1132 Start penetration of T2P into sediment
12 1140 End of T2P penetration, bit on BOH
13 1140 Raise BHA 4.5m off BOH
14 1241 Pull T2P uphole slowly with wireline
15 1244 Stop at 1057 mbsl, pumps off
16 1248 Pull T2P uphole slowly with wireline
17 1254 Stop at 741 mbsl, pumps off
18 1256 Pull T2P uphole slowly with wireline
19 1300 Stop at 491 mbsl, pumps off
20 1302 Pull T2P uphole slowly with wireline
21
Download data from data logger

Notes: Measurements taken 26 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.

Previous   |    Close   |    Next   |    Top of page