Table AT34. Event summary of T2P Deployment 13, Hole U1324C, 100.0 mbsf. (See table notes.)
| Event number |
Time (GMT) |
Event description |
|---|---|---|
| 1 | 1442 | Start data logger at 1 Hz |
| 2 | 1618 | T2P on rig floor |
| 3 | 1628 | Start lowering T2P downhole, pumps on |
| 4 | 1644 | Stop at 741 mbsl, pumps off |
| 5 | 1646 | Start lowering probe |
| 6 | 1652 | Stop at 1057 mbsl, pumps off |
| 7 | 1654 | Start lowering probe |
| 8 | 1703 | CDS lands in BHA, pumps off |
| 9 | 1704 | Start penetration of T2P into sediment |
| 10 | 1705 | End of T2P penetration, bit 1 m off BOH |
| 11 | 1706 | Raise BHA 2 m off BOH |
| 12 | 1808 | Pull T2P uphole slowly with wireline |
| 13 | 1811 | Stop at 1057 mbsl, pumps off |
| 14 | 1813 | Pull T2P uphole slowly with wireline |
| 15 | 1817 | Stop at 741 mbsl, pumps off |
| 16 | 1819 | Pull T2P uphole slowly with wireline |
| 17 | 1822 | Stop at 491 mbsl, pumps off |
| 18 | 1824 | Pull T2P uphole slowly with wireline |
| 19 | 1830 | Disconnect wireline from CDS |
| 20 | 1834 | Disconnect CDS from spacer |
| 21 | 1836 | Disconnect spacer from CDS |
| 22 | 1836 | T2P out of pipe |
| 23 | Download data from data logger |
Notes: Measurements taken 26 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.