Table AT34. Event summary of T2P Deployment 13, Hole U1324C, 100.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1442 | Start data logger at 1 Hz |
2 | 1618 | T2P on rig floor |
3 | 1628 | Start lowering T2P downhole, pumps on |
4 | 1644 | Stop at 741 mbsl, pumps off |
5 | 1646 | Start lowering probe |
6 | 1652 | Stop at 1057 mbsl, pumps off |
7 | 1654 | Start lowering probe |
8 | 1703 | CDS lands in BHA, pumps off |
9 | 1704 | Start penetration of T2P into sediment |
10 | 1705 | End of T2P penetration, bit 1 m off BOH |
11 | 1706 | Raise BHA 2 m off BOH |
12 | 1808 | Pull T2P uphole slowly with wireline |
13 | 1811 | Stop at 1057 mbsl, pumps off |
14 | 1813 | Pull T2P uphole slowly with wireline |
15 | 1817 | Stop at 741 mbsl, pumps off |
16 | 1819 | Pull T2P uphole slowly with wireline |
17 | 1822 | Stop at 491 mbsl, pumps off |
18 | 1824 | Pull T2P uphole slowly with wireline |
19 | 1830 | Disconnect wireline from CDS |
20 | 1834 | Disconnect CDS from spacer |
21 | 1836 | Disconnect spacer from CDS |
22 | 1836 | T2P out of pipe |
23 | Download data from data logger |
Notes: Measurements taken 26 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.