1 1442 Start data logger at 1 Hz
2 1618 T2P on rig floor
3 1628 Start lowering T2P downhole, pumps on
4 1644 Stop at 741 mbsl, pumps off
5 1646 Start lowering probe
6 1652 Stop at 1057 mbsl, pumps off
7 1654 Start lowering probe
8 1703 CDS lands in BHA, pumps off
9 1704 Start penetration of T2P into sediment
10 1705 End of T2P penetration, bit 1 m off BOH
11 1706 Raise BHA 2 m off BOH
12 1808 Pull T2P uphole slowly with wireline
13 1811 Stop at 1057 mbsl, pumps off
14 1813 Pull T2P uphole slowly with wireline
15 1817 Stop at 741 mbsl, pumps off
16 1819 Pull T2P uphole slowly with wireline
17 1822 Stop at 491 mbsl, pumps off
18 1824 Pull T2P uphole slowly with wireline
19 1830 Disconnect wireline from CDS
20 1834 Disconnect CDS from spacer
21 1836 Disconnect spacer from CDS
22 1836 T2P out of pipe