Table AT35. Event summary of T2P Deployment 14, Hole U1324C, 150.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 2128 | Stop at 491 mbsl, pumps off |
3 | 2130 | Start lowering T2P |
4 | 2135 | Stop at 741 mbsl, pumps off |
5 | 2137 | Start lowering T2P |
6 | 2143 | Stop at 1057 mbsl, pumps off |
7 | 2145 | Start lowering T2P |
8 | 2149 | Stop at 1195 mbsl, pumps off |
9 | 2152 | Start lowering T2P |
10 | 2155 | CDS lands in BHA, pumps off |
11 | 2156 | Start penetration of T2P into sediment |
12 | 2157 | End of T2P penetration, bit on BOH |
13 | 2157 | Raise BHA 2.5 m off BOH |
14 | 2302 | Pull T2P uphole slowly with wireline |
15 | 2309 | Stop at 1057 mbsl, pumps off |
16 | 2314 | Pull T2P uphole slowly with wireline |
17 | 2318 | Stop at 741 mbsl, pumps off |
18 | 2321 | Pull T2P uphole slowly with wireline |
19 | 2324 | Stop at 491 mbsl, pumps off |
20 | 2326 | Pull T2P uphole slowly with wireline |
21 | Download data from data logger |
Notes: Measurements taken 26 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page