Table AT35. Event summary of T2P Deployment 14, Hole U1324C, 150.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 2128 Stop at 491 mbsl, pumps off
3 2130 Start lowering T2P
4 2135 Stop at 741 mbsl, pumps off
5 2137 Start lowering T2P
6 2143 Stop at 1057 mbsl, pumps off
7 2145 Start lowering T2P
8 2149 Stop at 1195 mbsl, pumps off
9 2152 Start lowering T2P
10 2155 CDS lands in BHA, pumps off
11 2156 Start penetration of T2P into sediment
12 2157 End of T2P penetration, bit on BOH
13 2157 Raise BHA 2.5 m off BOH
14 2302 Pull T2P uphole slowly with wireline
15 2309 Stop at 1057 mbsl, pumps off
16 2314 Pull T2P uphole slowly with wireline
17 2318 Stop at 741 mbsl, pumps off
18 2321 Pull T2P uphole slowly with wireline
19 2324 Stop at 491 mbsl, pumps off
20 2326 Pull T2P uphole slowly with wireline
21
Download data from data logger