Table AT36. Event summary of T2P Deployment 15, Hole U1324C, 200.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 0049 | Start data logger at 1 Hz |
2 | 0156 | T2P on rig floor |
3 | 0209 | Start lowering T2P downhole, pumps on |
4 | 0217 | Stop at 491 mbsl, pumps off |
5 | 0219 | Start lowering probe |
6 | 0224 | Stop at 741 mbsl, pumps off |
7 | 0226 | Start lowering probe |
8 | 0232 | Stop at 1057 mbsl, pumps off |
9 | 0235 | Start lowering probe |
10 | 0240 | Stop at 1245 mbsl, pumps off |
11 | 0243 | Start lowering probe |
12 | 0247 | CDS lands in BHA, pumps off |
13 | 0248 | Start penetration of T2P into sediment |
14 | 0249 | End of T2P penetration, bit 1 m off BOH |
15 | 0252 | Raise BHA 4.5 m off BOH |
16 | 0353 | Pull T2P uphole slowly with wireline |
17 | 0356 | Stop at 1057 mbsl, pumps off |
18 | 0359 | Pull T2P uphole slowly with wireline |
19 | 0402 | Stop at 741 mbsl, pumps off |
20 | 0405 | Pull T2P uphole slowly with wireline |
21 | 0407 | Stop at 491 mbsl, pumps off |
22 | 0410 | Pull T2P uphole slowly with wireline |
23 | 0415 | Disconnect wireline from CDS |
24 | 0417 | Disconnect CDS from spacer |
25 | 0419 | Disconnect spacer from CDS |
26 | 0421 | T2P out of pipe |
27 | Download data from data logger |
Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.