Previous   |    Close   |    Next

Table AT36. Event summary of T2P Deployment 15, Hole U1324C, 200.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0049 Start data logger at 1 Hz
2 0156 T2P on rig floor
3 0209 Start lowering T2P downhole, pumps on
4 0217 Stop at 491 mbsl, pumps off
5 0219 Start lowering probe
6 0224 Stop at 741 mbsl, pumps off
7 0226 Start lowering probe
8 0232 Stop at 1057 mbsl, pumps off
9 0235 Start lowering probe
10 0240 Stop at 1245 mbsl, pumps off
11 0243 Start lowering probe
12 0247 CDS lands in BHA, pumps off
13 0248 Start penetration of T2P into sediment
14 0249 End of T2P penetration, bit 1 m off BOH
15 0252 Raise BHA 4.5 m off BOH
16 0353 Pull T2P uphole slowly with wireline
17 0356 Stop at 1057 mbsl, pumps off
18 0359 Pull T2P uphole slowly with wireline
19 0402 Stop at 741 mbsl, pumps off
20 0405 Pull T2P uphole slowly with wireline
21 0407 Stop at 491 mbsl, pumps off
22 0410 Pull T2P uphole slowly with wireline
23 0415 Disconnect wireline from CDS
24 0417 Disconnect CDS from spacer
25 0419 Disconnect spacer from CDS
26 0421 T2P out of pipe
27
Download data from data logger

Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.

Previous   |    Close   |    Next   |    Top of page