Table AT37. Event summary of T2P Deployment 16, Hole U1324C, 300.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1118 Start lowering T2P downhole, pumps on
3 1137 Stop at 491 mbsl, pumps off
4 1139 Start lowering probe
5 1143 Stop at 741 mbsl, pumps off
6 1145 Start lowering probe
7 1149 Stop at 1057 mbsl, pumps off
8 1152 Start lowering probe
9 1157 Stop at 1345 mbsl, pumps off
10 1159 Start lowering probe
11 1205 Start penetration of T2P into sediment
12 1217 End of T2P penetration, bit on BOH
13 1222 Raise BHA 4m off BOH
14 1347 Pull T2P uphole slowly with wireline
15 1354 Stop at 1057 mbsl, pumps off
16 1357 Pull T2P uphole slowly with wireline
17 1402 Stop at 741 mbsl, pumps off
18 1404 Pull T2P uphole slowly with wireline
19 1409 Stop at 491 mbsl, pumps off
20 1411 Pull T2P uphole slowly with wireline
21
Download data from data logger

Notes: Measurements taken 27 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, BOH = bottom of hole, BHA = bottom-hole assembly.