Previous   |    Close   |    Next

Table AT38. Event summary of T2P Deployment 17, Hole U1322B, 42.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1839 Start data logger at 1 Hz
2 2010 T2P on rig floor
3 2022 Start lowering T2P downhole, pumps on
4 2029 Stop at 491 mbsl, pumps off
5 2031 Start lowering probe
6 2035 Stop at 741 mbsl, pumps off
7 2037 Start lowering probe
8 2043 Stop at 1321 mbsl, pumps off
9 2046 Start lowering probe
10 2048 Stop at 1351 mbsl, pumps off
11 2050 Start lowering probe
12 2057 CDS lands in BHA, pumps off
13 2057 Start penetration of T2P into sediment
14 2100 End of T2P penetration, bit on BOH
15 2100 Raise BHA 4.0 m off BOH
16 2207 Pull T2P uphole slowly with wireline
17 2210 Stop at 1321 mbsl, pumps off
18 2213 Pull T2P uphole slowly with wireline
19 2219 Stop at 741 mbsl, pumps off
20 2221 Pull T2P uphole slowly with wireline
21 2226 Stop at 491 mbsl, pumps off
22 2228 Pull T2P uphole slowly with wireline
23 2232 Disconnect wireline from CDS
24 2235 Disconnect CDS from spacer
25 2237 Disconnect spacer from CDS
26 2238 T2P out of pipe
27
Download data from data logger

Notes: Measurements taken 28 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.

Previous   |    Close   |    Next   |    Top of page