Table AT39. Event summary of T2P Deployment 19, Hole U1322B, 134.3 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1230 Start lowering T2P downhole, pumps on
3 1236 Stop at 491 mbsl, pumps off
4 1238 Start lowering probe
5 1244 Stop at 741 mbsl, pumps off
6 1246 Start lowering probe
7 1303 Stop at 1321 mbsl, pumps off
8 1307 Start lowering probe
9 1334 Stop at 1443 mbsl, pumps off
10 1336 Start lowering probe
11 1341 CDS lands in BHA, pumps off
12 1352 Start penetration of T2P into sediment
13 1354 End of T2P penetration, bit on BOH
14 1354 Raise BHA 4.0 m off BOH
15 1425 Pull T2P uphole slowly with wireline
16 1429 Stop at 1321 mbsl, pumps off
17 1431 Pull T2P uphole slowly with wireline
18 1440 Stop at 741 mbsl, pumps off
19 1441 Pull T2P uphole slowly with wireline
20 1446 Stop at 491 mbsl, pumps off
21 1447 Pull T2P uphole slowly with wireline
22
Download data from data logger

Notes: Measurements taken 29 June 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.