Table AT40. Event summary of T2P Deployment 20, Hole U1322B, 157.8 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 1815 | T2P on rig floor |
3 | 1838 | Start lowering T2P downhole, pumps on |
4 | 1846 | Stop at 491 mbsl, pumps off |
5 | 1849 | Start lowering probe |
6 | 1854 | Stop at 741 mbsl, pumps off |
7 | 1857 | Start lowering probe |
8 | 1905 | Stop at 1321 mbsl, pumps off |
9 | 1908 | Start lowering probe |
10 | 1913 | Stop at 1467 mbsl, pumps off |
11 | 1919 | Start lowering probe |
12 | 1936 | CDS lands in BHA, pumps off |
13 | 1936 | Start penetration of T2P into sediment |
14 | 1937 | End of T2P penetration, bit on BOH |
15 | 1937 | Raise BHA 4.0 m off BOH |
16 | 2043 | Pull T2P uphole slowly with wireline |
17 | 2110 | Disconnect wireline from CDS |
18 | 2113 | Disconnect CDS from spacer |
19 | 2114 | Disconnect spacer from CDS |
20 | 2215 | T2P out of pipe |
21 | Download data from data logger |
Notes: Measurements taken 29 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.
Previous | Close | Next | Top of page