Table AT40. Event summary of T2P Deployment 20, Hole U1322B, 157.8 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1815 T2P on rig floor
3 1838 Start lowering T2P downhole, pumps on
4 1846 Stop at 491 mbsl, pumps off
5 1849 Start lowering probe
6 1854 Stop at 741 mbsl, pumps off
7 1857 Start lowering probe
8 1905 Stop at 1321 mbsl, pumps off
9 1908 Start lowering probe
10 1913 Stop at 1467 mbsl, pumps off
11 1919 Start lowering probe
12 1936 CDS lands in BHA, pumps off
13 1936 Start penetration of T2P into sediment
14 1937 End of T2P penetration, bit on BOH
15 1937 Raise BHA 4.0 m off BOH
16 2043 Pull T2P uphole slowly with wireline
17 2110 Disconnect wireline from CDS
18 2113 Disconnect CDS from spacer
19 2114 Disconnect spacer from CDS
20 2215 T2P out of pipe
21
Download data from data logger