Table AT41. Event summary of T2P Deployment 23, Hole U1322C, 150.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 0651 T2P on rig floor
3 0701 Start lowering T2P downhole, pumps on
4 0709 Stop at 491 mbsl, pumps off
5 0712 Start lowering probe
6 0717 Stop at 741 mbsl, pumps off
7 0719 Start lowering probe
8 0729 Stop at 1321 mbsl, pumps off
9 0743 Start lowering probe
10 0752 Stop at 1459 mbsl, pumps off
11 0754 Start lowering probe
12 0758 CDS lands in BHA, pumps off
13 0758 Start penetration of T2P into sediment
14 0802 End of T2P penetration, bit 1 m off BOH
15 0803 Raise BHA 4.0 m off BOH
16 0905 Pull T2P uphole slowly with wireline
17 0912 Stop at 1321 mbsl, pumps off
18 0914 Pull T2P uphole slowly with wireline
19 0924 Stop at 741 mbsl, pumps off
20 0926 Pull T2P uphole slowly with wireline
21 0932 Stop at 491 mbsl, pumps off
22 0934 Pull T2P uphole slowly with wireline
23
Download data from data logger

Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.