Table AT42. Event summary of T2P Deployment 24, Hole U1322C, 200.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1201 | Stop at 491 mbsl for 2 min |
2 | 1208 | Stop at 741 mbsl for 2.5 min |
3 | 1222 | Stop at 1321 mbsl for 3 min |
4 | 1226 | Stop at 1367 mbsl for 7 min |
5 | 1239 | Stop at 1509 mbsl, pumps off |
6 | 1212 | Start lowering probe |
7 | 1248 | CDS lands in BHA |
8 | 1249 | Lowering BHA, start penetration |
9 | 1251 | End of T2P penetration, bit 1 m off BOH |
10 | 1251 | Raise BHA 5 m off BOH |
11 | 1351 | Pull T2P uphole slowly with wireline |
12 | 1357 | Stop at 1321 mbsl for 2.5 min, pumps off |
13 | 1409 | Stop at 741 mbsl for 2 min, pumps off |
14 | 1414 | Stop at 491 mbsl for 3 min, pumps off |
15 | 1416 | Pull T2P uphole slowly with wireline |
Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, CDS = colleted delivery system, BHA = bottom-hole assembly, T2P = temperature/dual pressure probe, BOH = bottom of hole.
Previous | Close | Next | Top of page