Table AT42. Event summary of T2P Deployment 24, Hole U1322C, 200.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1201 Stop at 491 mbsl for 2 min
2 1208 Stop at 741 mbsl for 2.5 min
3 1222 Stop at 1321 mbsl for 3 min
4 1226 Stop at 1367 mbsl for 7 min
5 1239 Stop at 1509 mbsl, pumps off
6 1212 Start lowering probe
7 1248 CDS lands in BHA
8 1249 Lowering BHA, start penetration
9 1251 End of T2P penetration, bit 1 m off BOH
10 1251 Raise BHA 5 m off BOH
11 1351 Pull T2P uphole slowly with wireline
12 1357 Stop at 1321 mbsl for 2.5 min, pumps off
13 1409 Stop at 741 mbsl for 2 min, pumps off
14 1414 Stop at 491 mbsl for 3 min, pumps off
15 1416 Pull T2P uphole slowly with wireline

Notes: Measurements taken 1 July 2005. GMT = Greenwich Mean Time, CDS = colleted delivery system, BHA = bottom-hole assembly, T2P = temperature/​dual pressure probe, BOH = bottom of hole.