Table AT43. Event summary of T2P Deployment 25, Hole U1322D, 40.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 0206 Start lowering T2P downhole, pumps on
3 0214 Stop at 491 mbsl, pumps off
4 0221 Stop at 741 mbsl, pumps off
5 0232 Stop at 1321 mbsl, pumps off
6 0238 Stop at 1349 mbsl, pumps off
7 0240 Start lowering probe
8 0245 CDS lands in BHA, pumps off
9 0246 Start penetration of T2P into sediment
10 0246 End of T2P penetration, bit 0.8 m off BOH
11 0246 Raise BHA 4.0 m off BOH
12 0349 Pull T2P uphole slowly with wireline
13 0352 Stop at 1321 mbsl, pumps off
14 0355 Pull T2P uphole slowly with wireline
15 0402 Stop at 741 mbsl, pumps off
16 0404 Pull T2P uphole slowly with wireline
17 0408 Stop at 491 mbsl, pumps off
18 0410 Pull T2P uphole slowly with wireline
19
Download data from data logger

Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.