Table AT43. Event summary of T2P Deployment 25, Hole U1322D, 40.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 0206 | Start lowering T2P downhole, pumps on |
3 | 0214 | Stop at 491 mbsl, pumps off |
4 | 0221 | Stop at 741 mbsl, pumps off |
5 | 0232 | Stop at 1321 mbsl, pumps off |
6 | 0238 | Stop at 1349 mbsl, pumps off |
7 | 0240 | Start lowering probe |
8 | 0245 | CDS lands in BHA, pumps off |
9 | 0246 | Start penetration of T2P into sediment |
10 | 0246 | End of T2P penetration, bit 0.8 m off BOH |
11 | 0246 | Raise BHA 4.0 m off BOH |
12 | 0349 | Pull T2P uphole slowly with wireline |
13 | 0352 | Stop at 1321 mbsl, pumps off |
14 | 0355 | Pull T2P uphole slowly with wireline |
15 | 0402 | Stop at 741 mbsl, pumps off |
16 | 0404 | Pull T2P uphole slowly with wireline |
17 | 0408 | Stop at 491 mbsl, pumps off |
18 | 0410 | Pull T2P uphole slowly with wireline |
19 | Download data from data logger |
Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.