Table AT44. Event summary of T2P Deployment 26, Hole U1322D, 70.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 0632 T2P on rig floor
3 0656 Stop at 741 mbsl, pumps off
4 0707 Stop at 1321 mbsl, pumps off
5 0718 Stop at 1386 mbsl, pumps off
6 0720 Start lowering probe
7 0724 CDS lands in BHA, pumps off
8 0726 Start penetration of T2P into sediment
9 0727 End of T2P penetration, bit 0.8 m off BOH
10 0727 Raise BHA 4.0 m off BOH
11 0814 Pull T2P uphole slowly with wireline
12 0816 Stop at 1321 mbsl, pumps off
13 0826 Stop at 741 mbsl, pumps off
14 0832 Stop at 491 mbsl, pumps off
15
Download data from data logger

Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.