Table AT45. Event summary of T2P Deployment 27, Hole U1322D, 100.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 1104 | Stop at 491 mbsl, pumps off |
3 | 1115 | Stop at 741 mbsl, pumps off |
4 | 1115 | Stop at 1321 mbsl, pumps off |
5 | 1124 | Stop at 1409 mbsl, pumps off |
6 | 1126 | Start lowering T2P |
7 | 1129 | CDS lands in BHA, pumps off |
8 | 1129 | Start penetration of T2P into sediment |
9 | 1130 | End of T2P penetration, bit 0.8 m off BOH |
10 | 1130 | Raise BHA 4.0m off BOH |
11 | 1216 | Pull T2P uphole slowly with wireline |
12 | 1219 | Stop at 1321 mbsl, pumps off |
13 | 1228 | Stop at 741 mbsl, pumps off |
14 | 1235 | Stop at 491 mbsl, pumps off |
15 | Download data from data logger |
Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.