Previous   |    Close   |    Next

Table AT45. Event summary of T2P Deployment 27, Hole U1322D, 100.0 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1
Start data logger at 1 Hz
2 1104 Stop at 491 mbsl, pumps off
3 1115 Stop at 741 mbsl, pumps off
4 1115 Stop at 1321 mbsl, pumps off
5 1124 Stop at 1409 mbsl, pumps off
6 1126 Start lowering T2P
7 1129 CDS lands in BHA, pumps off
8 1129 Start penetration of T2P into sediment
9 1130 End of T2P penetration, bit 0.8 m off BOH
10 1130 Raise BHA 4.0m off BOH
11 1216 Pull T2P uphole slowly with wireline
12 1219 Stop at 1321 mbsl, pumps off
13 1228 Stop at 741 mbsl, pumps off
14 1235 Stop at 491 mbsl, pumps off
15
Download data from data logger

Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/​dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.

Previous   |    Close   |    Next   |    Top of page