Table AT46. Event summary of T2P Deployment 28, Hole U1322D, 134.0 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | Start data logger at 1 Hz | |
2 | 1452 | T2P on rig floor |
3 | 1510 | Stop at 491 mbsl, pumps off |
4 | 1512 | Start lowering probe |
5 | 1515 | Stop at 741 mbsl, pumps off |
6 | 1516 | Start lowering probe |
7 | Download data from data logger |
Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe.
Previous | Close | Top of page