Previous   |    Close   |    Next

Table AT9. Event summary of DVTPP Deployment 7, Hole U1324B, 493.1 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0735 Start lowering DVTPP downhole
2 0743 Stop at mudline for 5 min
3 0748 Start lowering probe
4
Raise BHA off BOH
5 0755 CDS lands in BHA
6 0757 Lower bit, start penetration of DVTPP into formation
7 0801 End of penetration, bit on BOH
8
Raise BHA off BOH
9 0832 Pull probe out of formation and uphole with wireline
10 0839 Stop at mudline for 5 min
11 0844 Pull DVTPP uphole with wireline

Notes: Measurements taken 24 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.

Previous   |    Close   |    Next   |    Top of page