Table AT8. Event summary of DVTPP Deployment 6, Hole U1324B, 464.3 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0220 Start lowering DVTPP downhole
2 0230 Stop at mudline for 5 min
3 0235 Start lowering probe
4
Raise BHA off BOH
5 0247 CDS lands in BHA
6 0253 Lower bit, start penetration of DVTPP into formation
7 0257 End of penetration, bit on BOH
8
Raise BHA off BOH
9 0331 Pull probe out of formation and uphole slowly with wireline
10 0338 Stop at mudline for 5 min
11 0343 Pull DVTPP uphole slowly with wireline

Notes: Measurements taken 24 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.